An excavator can leave an Indian factory while much of the machinery inside it has crossed a border. Expanding the assembly line will increase output. Reducing dependence requires someone to manufacture the engine, transmission, hydraulics and other systems that make the machine work.
That is the problem behind the Cabinet’s ₹11,000 crore construction and infrastructure equipment scheme, approved on 25 November. The government is offering manufacturers a reason to invest. Whether the public money buys deeper manufacturing capability will depend on which production qualifies, how local value is verified and when companies receive payment.
Most of the dependence sits inside the machine
A 28 July parliamentary reply cited ICEMA’s estimate of ₹34,500 crore in construction-equipment import dependence during FY2024–25. Fully built equipment accounted for ₹4,250 crore. Components and aggregates used in domestic manufacturing accounted for nearly ₹30,250 crore.
Divide the second number by the total and the component share is about 88%. That is a calculation from the industry estimate reported to Parliament, rather than a fresh customs-data audit. It describes the composition of that import estimate, not the imported share of every machine made in India.
A finished-machine incentive can expand domestic sales without replacing the foreign systems inside the product. A component incentive has to persuade suppliers to undertake the harder investment in manufacturing, testing and customer qualification.
The Cabinet briefing includes both: seven equipment categories and five component categories. The latter cover engines, transmissions, hydraulic systems, undercarriages and drive systems. The scheme’s design recognises the supply-chain problem. Delivery now depends on the rules and the investment decisions those rules produce.
What the ₹11,000 crore commits to
The Ministry of Heavy Industries will implement an eight-year scheme. The Cabinet announcement divides it into a two-year setup period in FY2026–27 and FY2027–28, five years of incentive disbursement from FY2028–29 through FY2032–33, and settlement of the final year’s eligible sales in FY2033–34.
The briefing’s incentive chart distinguishes graded rates of 13–10% for equipment and 11–8% for components. The announcement also provides up to ₹375 crore in viability-gap support for a dedicated testing facility; the briefing identifies ARAI as the recipient.
Those numbers describe an approved programme. They do not establish a company’s entitlement, annual government expenditure or a contractor’s equipment discount. The reviewed announcement does not set out the full base-year calculation, applicant-level caps, domestic-value thresholds or claim-processing timetable.
For illustration, ₹100 crore of qualifying incremental sales at an applicable 10% rate would produce a ₹10 crore incentive before any cap or other condition. That is arithmetic, not a forecast of an applicant’s payment. Change the eligible sales base or the applicable rate and the receipt changes. Delay settlement and the financing cost changes too.
A sales incentive leaves a financing gap before payment
A supplier must pay for facilities, tooling, inventory and people before it can sell qualifying output. Under this schedule, the factory-building period precedes incentive disbursement. The company and its lenders must finance that interval.
A business plan should therefore separate three cash flows: investment in the plant, cash collected from customers and incentive receipts after approval. Combining them into one revenue forecast conceals the period when the manufacturer is carrying the cost.
The same discipline applies after production begins. A sale may create a customer receivable before it becomes cash. An incentive claim may require verification before it becomes payable. For an applicant with limited liquidity, the time between those events can determine whether an otherwise viable expansion remains financeable.
A lender should test the project with delayed incentive receipts and slower sales. A manufacturer should know how much working capital it needs under that case. The Cabinet approval supplies neither answer.
Assembly growth and supplier capability need different measures
Sales are comparatively easy to count. Domestic capability needs a closer examination of what changed in the product and its supply chain.
The operating rules should show how imported inputs are treated, how related-party transactions are checked and how equipment and component claims interact. A machine’s sales value includes its components. Any assessment of public support needs to explain how the scheme handles overlapping eligible activity, rather than assuming each reported sale represents a separate gain in local capability.
There is also a commercial test after the incentive declines. Can the component supplier meet the buyer’s price, reliability and delivery requirements? Will customers keep buying when the support is lower? A protected order during the scheme is useful evidence of demand, but it cannot settle the question of long-term competitiveness.
For a contractor buying the machine, availability of service and replacement parts belongs beside the purchase price. A cheaper acquisition that leaves a critical machine waiting for a part can become an expensive procurement decision. Local production earns its value when it improves the economics of using the equipment as well as making it.
The testing facility needs a business model
The proposed facility addresses a different investment problem: access to testing and certification. Shared infrastructure can reduce the need for each manufacturer to build equivalent facilities. The benefit depends on the tests offered, access conditions, charges and turnaround time.
A capital grant funds establishment. Operating the facility requires staff, maintenance, calibration and a flow of customers. Its financial plan should explain how those costs will be met and whether smaller component suppliers can afford to use it.
The useful measures are commissioning, accredited testing scope, utilisation and the time manufacturers spend obtaining results. A sanctioned grant is the first entry in that record.
Follow the claims, then follow the machines
The next documents to watch are the operating guidelines, application conditions and approved applicants. They should make the sales baseline, local-value rules, payment limits and verification process legible enough for a manufacturer to prepare a financing plan.
Once production begins, the reporting should distinguish investment committed from investment completed, claims submitted from claims paid, and component output from finished-machine assembly. Import substitution needs a defined product basket and comparison period; a rising domestic sales total cannot establish it on its own.
The first disbursement period starts in FY2028–29. Before then, the evidence should be visible in facilities commissioned, suppliers qualified and equipment tested. Those are the milestones against which the ₹11,000 crore approval should be judged.