A workshop in Dharavi can be more than a place of production. It can also be a worker's workplace, shelter and source of income for an entire family. Nafees Khan, a migrant worker employed at a grinding-machine workshop in Tera Compound, earned ₹20,000 a month and also slept at the workshop. His employer, like several other business owners, faced uncertainty over whether the unit would receive adequate space to continue manufacturing after redevelopment. His circumstances bring a larger question into focus: what happens to the livelihoods and businesses operating within the buildings that are set to be replaced?”

Dharavi's redevelopment is therefore not simply a matter of replacing existing structures with formal buildings. It involves reorganising a dense settlement where manufacturing, trade, employment and residential activity often operate alongside one another. The challenge for the infrastructure project is to provide improved physical conditions without disconnecting businesses from the people, facilities and supply chains on which they depend.

An industrial ecosystem within a residential neighbourhood

Dharavi supports a range of small-scale activities, including leather manufacturing, garment production, pottery, food processing and recycling. These are not isolated enterprises. They depend on networks of workers, suppliers, traders, transporters and customers, many of which operate within or close to the settlement.

A 2025 study published in the International Journal of Urban and Regional Research examined a leather manufacturing complex in Dharavi to understand how occupation and physical space are connected. The research documented how production, storage, workshops and worker accommodation can coexist within the same building. It also identified the importance of nearby suppliers and supporting businesses to maintaining production.

This is an important consideration for infrastructure planning. A manufacturing unit cannot be assessed only by the carpet area it occupies. Its requirements may include machinery access, ventilation, electricity, storage, loading space and proximity to other stages of production. These requirements also vary across industries: a pottery workshop, a garment unit and a plastic recycling facility do not operate in the same way.

What the redevelopment plan provides

The Maharashtra government's proposed masterplan identifies the preservation of Dharavi's live-work ecosystem as one of its development goals. It proposes mixed-use neighbourhoods, alongside facilities for industrial and commercial units, with their locations planned to improve access to the wider city. The plan also identifies five proposed industry clusters: garments, pottery, leather, food and recycling.

The commercial rehabilitation framework provides eligible commercial and industrial unit holders with up to their existing area or 225 sq. ft., whichever is less, free of cost. Eligible units can seek additional space through a paid mechanism under the prescribed terms. An expression-of-interest process for additional commercial and industrial space had a submission deadline of August 24, 2025.

These provisions establish the proposed framework, but they also raise questions about whether the replacement premises will be adequate for different kinds of businesses. A unit that currently uses a larger area may need to purchase additional space, while a workshop with specialised machinery may require a layout that a standard commercial unit cannot provide.

The project has now moved towards physical construction. On October 12, 2026, rehabilitation construction began at the 22-acre Matunga railway land parcel. The proposed development comprises 10 towers with 10,432 rehabilitation apartments and 1,379 commercial and industrial units. The first five towers are scheduled for handover by March 2029, followed by two in August 2029 and the remaining three by August 2030. This is a significant construction milestone, but the proposed commercial and industrial units should not automatically be treated as confirmation that every existing workshop will receive replacement premises. The eligibility, allocation and suitability of these units for different businesses remain important questions.

The transition is as important as the final buildings

One of the less examined aspects of redevelopment is how businesses will function while construction and relocation take place. A workshop that has to vacate its premises cannot necessarily resume production immediately in a different location. Machinery must be shifted, workers need access to the new workplace, and suppliers and customers must be able to reach it.

Recent developments in Sector 6 illustrate how relocation is already becoming an implementation issue. In August 2026, the redevelopment authority reported that eligible commercial establishments in Ganesh Nagar-Meghwadi had been offered rental assistance of ₹175 per sq. ft. per month, alongside brokerage and shifting support. These arrangements concern the identified establishments in that relocation process and should not be assumed to apply uniformly to all Dharavi businesses. They nevertheless raise an important question about how temporary operating arrangements will work for workshops with different space and production requirements.

The project is intended to be implemented in phases, but phased construction alone does not establish how individual businesses will continue operating. The availability of temporary workspaces, the sequencing of relocation and the maintenance of access for goods and workers require specific arrangements.

Designing buildings around the work they must support

For the infrastructure sector, the question is not only how many commercial or industrial units can be constructed, but whether those buildings can accommodate the activities intended to take place inside them.

Manufacturing workshops may require higher electrical capacity, adequate ventilation, water supply, drainage, machinery movement and space for raw materials and finished goods. Recycling units may need dedicated areas for sorting and processing, while pottery businesses require space for shaping, drying, firing and storing products.

The proposed industry clusters could help retain some of the proximity between related businesses. However, their effectiveness will depend on how they are designed and equipped. The masterplan also proposes improved road connections and transport integration. Better connectivity could support the movement of workers and goods, but industrial access, loading facilities and local transport arrangements will also matter.

Planning for this infrastructure is increasingly supported by digital mapping. A September 2026 update described the use of drone surveys, LiDAR mapping, GIS technology and door-to-door digital surveys to create a digital twin of Dharavi. The mapping is intended to help plan roads, buildings, utilities, drainage and social infrastructure. The project has also reported progress in numbering structures and documenting households. However, household documentation figures should not be treated as completed assessments of industrial units. Whether the survey captures the machinery, floor-area and utility requirements of individual workshops remains an important question.

What happens to workers and the businesses around them?

The consequences of relocation extend beyond business owners. In Dharavi, some workers live at or near their workplaces, while others depend on the surrounding neighbourhood for affordable accommodation and daily services. A change in the location or operating arrangement of a workshop could therefore affect both employment and living costs.

There is also a wider supply-chain consideration. Dharavi's recycling economy, for instance, involves waste collection, sorting, processing and the movement of recovered materials to other businesses. If individual units are relocated without considering their relationships with suppliers and buyers, additional transport requirements and changes in operating costs could follow. These are risks to examine, not inevitable outcomes of redevelopment.

Measuring redevelopment through business continuity

For Dharavi's redevelopment, the success of industrial rehabilitation will ultimately depend on more than the number of units constructed. It will require suitable premises, reliable infrastructure, access to transport and markets, and a transition process that allows existing businesses to continue operating.

This also presents an important implementation challenge for the infrastructure industry. Large urban redevelopment projects must account for the economic activities already taking place within their project boundaries. Surveys, eligibility assessments, building design, utility planning and construction sequencing need to be coordinated with the operational requirements of existing enterprises.

The next stage of scrutiny should therefore focus on how temporary operations will be managed, whether proposed industrial spaces meet the requirements of different trades, and how workers and business networks will be accommodated. These questions need to be answered through project-level details and direct engagement with workshop owners, workers and redevelopment authorities.

Dharavi's redevelopment is intended to improve its built environment and provide better infrastructure. But the transition will also be judged by whether the businesses that sustain its local economy can continue producing and employing people. A new workshop may provide a replacement address; the larger test is whether it can continue doing the work that made the original one viable.