When a city struggles to secure enough water for its residents, how much of that scarce resource should go into building its next apartment complex, office tower or commercial development? In Bengaluru, this is no longer just a question of water conservation. It is a question of how a rapidly growing city allocates its limited water resources between the people who live in it and the infrastructure it continues to build. Construction activities such as concrete curing require water, adding to the pressure on groundwater and other existing supplies. Yet the city generates millions of litres of treated wastewater that could potentially meet some of this demand. Redirecting that water towards construction could reduce competition for freshwater, ease pressure on groundwater and make better use of existing sewage treatment infrastructure. But there is a practical question behind this proposition: what does treated water actually cost a construction site once transportation, quality testing and storage are factored in?
The case for treated water in construction
Bengaluru's water crisis in 2024 exposed the construction industry's dependence on groundwater and private tanker supplies. As borewells ran dry and tanker prices increased, the Bangalore Water Supply and Sewerage Board (BWSSB) moved to restrict the use of potable water for non-essential activities, including construction.
In April 2024, BWSSB announced plans to supply approximately 10 million litres per day (MLD) of treated water to construction projects. The initiative involved working with the Confederation of Real Estate Developers' Associations of India (CREDAI) and expanding tanker-based distribution. The Board also explored separate pipelines for construction sites located close to sewage treatment plants.
The initiative was significant because it sought to connect wastewater treatment infrastructure with an existing industrial demand for non-potable water. Rather than relying entirely on freshwater, construction companies could potentially use treated wastewater for activities that do not require drinking-quality supplies.
The opportunity remains substantial. According to a February 2026 report on BWSSB's operations, Bengaluru had 34 sewage treatment plants treating approximately 1,348 MLD of wastewater, with nearly 1,000 MLD being recycled or reused. Around 950 MLD was reportedly being directed towards lake replenishment. This indicates that the city has considerable treatment capacity, although not all treated water is available for commercial or construction use.
Not every treated-water supply is suitable for concrete
For developers, the first consideration is whether the water meets the technical requirements of its intended application.Concrete curing is a particularly relevant use. After concrete is poured, maintaining adequate moisture allows cement hydration to continue, helping the material develop the required strength and durability. Unsuitable water can affect concrete quality and, in reinforced structures, increase the risk of reinforcement corrosion.
Under IS 456:2000, water used for concrete mixing and curing must satisfy specified quality requirements. These include limits on organic solids, inorganic solids, sulphates, chlorides and suspended matter. For reinforced concrete, the chloride limit is generally 500 mg/l, while the pH must not be below 6.
Consequently, treated wastewater cannot be considered suitable for construction simply because it has passed through an STP. Its quality must be tested against the requirements of the intended application. Water meeting general wastewater discharge standards does not automatically establish its suitability for concrete work.
Developers therefore need quality documentation from suppliers and appropriate laboratory testing before using treated water for concrete-related activities. Periodic monitoring is also important because wastewater quality can vary depending on treatment performance and operating conditions.
The price of water is only the beginning
BWSSB's recycled-water tariff structure, notified through a Karnataka Gazette publication in May 2013, listed secondary treated water at Rs 10 per kilolitre when collected through tankers at treatment plant premises. The corresponding rate for tertiary treated water was Rs 15 per kilolitre. Pipeline supply was listed at Rs 15 and Rs 25 per kilolitre, respectively, with beneficiaries bearing the pipeline installation cost.
These are historical notified rates, not independently confirmed current tariffs. In April 2024, BWSSB chairman Ram Prasath Manohar stated that builders using the Board's hired tankers would have to pay transportation charges separately, in addition to the Rs 10 per kilolitre water charge. The Board had arranged 26 tankers, each with a capacity of 24,000 litres, for distribution.
This distinction is important because the price of water at the treatment plant does not represent its final cost at a construction site. The distance between the plant and the site, tanker availability, vehicle capacity and delivery frequency all influence the final procurement expense.
There are additional costs associated with laboratory testing, dedicated storage tanks and pumping arrangements. The site must have sufficient storage capacity to accommodate deliveries and maintain supplies between tanker trips.
The Bureau of Indian Standards' laboratory directory lists construction-water testing against IS 456. However, testing charges vary between laboratories, and the final cost per kilolitre depends on how much water is covered by each test and how frequently samples are tested.
What happens when the tankers stop arriving?
For a construction site, the reliability of water supply is as important as its price. Concrete curing requires water at specified intervals, and unpredictable deliveries can disrupt construction schedules and create additional procurement expenses.
Bengaluru's experience illustrates the difficulty of establishing this supply chain. In November 2025, The Times of India reported that apartment complexes were discharging surplus treated water into stormwater drains because adequate transportation and storage arrangements were unavailable. The problem highlighted a gap between the availability of treated wastewater and the infrastructure required to distribute it.
The issue continued to feature in BWSSB's discussions in April 2026, when the Board sought to expand treated-water use among construction companies, data centres and other commercial consumers. Stakeholders raised concerns about quality standards, certification and the absence of an organised distribution network.
For developers, this creates an operational risk. Depending entirely on treated water without adequate reserve storage or alternative authorised suppliers could leave construction activities vulnerable to supply interruptions. A commercially viable arrangement must therefore account for continuity of supply, not merely the initial purchase price.
Building a market for recycled water
Bengaluru's experience highlights a larger infrastructure challenge: treatment capacity does not automatically translate into effective water reuse. The economic value of sewage treatment infrastructure depends partly on whether its output can reach consumers who need it.
Construction offers a potential market for non-potable water. Greater reuse could reduce dependence on groundwater, improve the utilisation of existing treatment infrastructure and create additional revenue opportunities for treatment plants and apartment-level STPs.
However, expanding this market requires transparent tariffs, verifiable quality standards, accessible testing facilities, sufficient tanker capacity and reliable distribution arrangements.
For the construction industry, the commercial calculation must include the entire supply chain rather than just the price quoted at the treatment plant. For Bengaluru, the larger question is whether its wastewater infrastructure can be connected effectively to the city's growing demand for water.
Ultimately, treated water will become a viable construction resource only when it is as dependable as it is affordable. The success of Bengaluru's reuse strategy will depend not simply on how much wastewater the city can treat, but on how much of it can be delivered safely, consistently and economically to the places where it is needed.